SII · Independent document review

Contractor Estimate Review for Homeowners

Know what to ask before you sign a remodeling contract.

Already have a contractor estimate? SII checks the scope of work, materials, quantities and payment terms in the documents you received, then flags missing or conflicting details to clarify.

  • No account needed
  • PDFs, photos or screenshots
  • One contractor’s estimate per review

We review documents. We do not rate a contractor’s honesty or workmanship.

STANDARD INTEGRITY INSTITUTE01

Fictional reading example · Not an actual review

A lump sum. But what does it include?

The original wording

Work itemPricing basis
CabinetryLump sum

What this line leaves to clarify

Dimensions
Which cabinet, and what size?
Materials
Which boards, doors and hardware?
Included work
Are delivery, installation and finishing included?

Check the drawings and materials schedule first. Details missing from this line may be documented elsewhere.

READUnderstand the quote
COMPARECompare the details
DISCUSSAsk specific questions

A question for your contractor

Take this question to your next conversation.

Please identify the drawings and dimensions for this cabinetry item, specify the boards and hardware, and confirm whether delivery, installation and finishing are included in the total. Please list any separately charged work.

What do you need to check in your estimate?

01

Reading your first contractor estimate

Start with the work locations and quantities, then check the materials and payment terms.

Six fields to read first
02

Comparing different prices

One firm includes waste removal; another does not mention it. Confirm the scope before comparing totals.

Compare contractor estimates

What you receive

Start with free results. Decide what you need next.

Free Key Results summarize the main document issues by email. The separate paid Complete Risk Report format provides individual findings and explanations; the free results do not include all report details.

Included at no charge

Free Key Results

See how clearly the documents describe the work and where to focus your questions.

Document Maturity LEVEL 1–5
An assessment of document clarity, completeness and comparability.
Main risk signals
Highlights of unclear or missing information.
Pricing, payment and terms
Points to clarify, such as how charges are calculated or when payments are due.
See a sample report

Optional paid report

Complete Risk Report

For a closer look at individual findings, their reasons and suggested follow-up.

  • SII-R criteria and locations in your documents
  • Findings with an explanation of each issue
  • Suggested additions and points to confirm before signing
See the complete report format

A method you can read for yourself

30 public criteria for reviewing what an estimate says.

Standard Integrity Institute (SII) uses SII-R001–SII-R030 to review your documents across four dimensions. You can read the criteria and see how a report presents the findings.

Transparency
Are the work, quantities and material specifications stated?
Consistency
Do the quote, drawings, attachments and amounts agree?
Reasonableness
Do charges or terms contain duplication, contradictions or points needing explanation?
Executability
Are there clear arrangements for changes, acceptance and warranty claims?

SII provides document review and risk indicators. This is not legal advice, engineering or market-price appraisal, a workmanship guarantee, or contractor endorsement.

Before you upload

Can you review an estimate, quote or bid before I sign?

Yes. Submit the documents from one contractor with any related drawings, material lists and payment schedule. A file may be called an estimate, quote, bid or proposal; SII reviews its actual wording and attachments, not the label alone. Clear photos and screenshots are accepted.

How do I receive Free Key Results? Is a purchase required?

Free Key Results are sent to the email address you enter and confirm. They are not an instant on-screen estimate or a full paid report. No purchase is required to receive the free results.

Can you tell me whether a contractor is reliable or a price is too high?

SII reviews the documents. Unclear items, repeated charges or payment terms can raise questions to follow up. They do not establish dishonesty, workmanship quality or a definitive market price. LEVEL 1–5 describes Document Maturity only.

Should I remove names or addresses before uploading?

You may redact unrelated sensitive personal information. Keep the work items, prices, specifications and terms needed for review. Documents are used for this review and to prepare and deliver results. See the Privacy Policy and Terms of Service for the applicable data-handling terms.

What if I do not have a quote yet?

Ask your designer or contractor for a written quote covering the scope, materials, amounts and payment terms. Our reading guides can help you prepare questions for that discussion.

Bring specific questions to your next conversation.

Submit one contractor’s estimate and its related attachments. Choose English in the form and check your email address before submitting.

  1. Gather your documents

    Include the quote and any attachments as PDFs, photos or screenshots.

  2. Add details and submit

    Describe your project and confirm your email address.

  3. Receive your free results

    Check the email address you confirmed, including your spam folder.

Submit my estimate for free

© 2026 Standard Integrity Institute (SII). All rights reserved.

This report and the website content are intended solely as strategic reference for pricing and contract negotiations, and do not constitute formal legal endorsement.

© 2026 Standard Integrity Institute (SII). All rights reserved.

This report and the website content are intended solely as strategic reference for pricing and contract negotiations, and do not constitute formal legal endorsement.