Contractor estimate review · File preparation

Upload your contractor estimate.

Get Free Key Results about the documents you already have.

Submit one contractor’s estimate and related attachments. SII reviews scope, materials, quantities and payment terms, then identifies missing or conflicting details to discuss before signing.

Submit my estimate for free

Opens the English SII upload form

  • No account needed
  • PDFs, photos or screenshots
  • Free Key Results by email
See how to prepare your files

We review documents. We do not rate contractors or guarantee workmanship.

01 / Prepare your files

Use the documentsyou already have.

Use one submission for one contractor’s estimate and all its related files. Keep every page readable, including quantities, amounts, specifications and notes. Submit different contractors separately; this is not an automatic side-by-side comparison service.

Choose your file type for preparation tips

Keep every page in its original order.

  • Include the cover, itemized pages and notes, rather than just the total price.
  • Submit available drawings, materials lists, payment schedules and additional terms with the quote.
  • You can submit your current quote even if you do not yet have a contract or other attachments.
Example filename

Firm-A_Quote_v1.pdf

02 / Complete the form

Here is what the form will ask for.

After adding your files, read the Terms of Service, Privacy Policy, Refund Policy and Disclaimer listed in the form, then confirm your submission.

Your email address
Enter it twice and check the spelling. Your results will be sent here.
Project region and type
Choose the country where the work will take place and the main project type.
Report language
Check that Preferred Report Language is set to English for an English report.
Not sure which project type to choose?

Use the main scope of the work. A waterproofing-only quote from a design firm can be classified as Specialized Works.

Residential Renovation
Renovation of a home, apartment or other residential space.
Commercial Renovation
Work for a shop, office, restaurant or other business premises.
Specialized Works
Specific trades such as waterproofing, electrical work, plumbing or windows.
Self-Build Construction
Ground-up buildings or construction projects spanning several stages.
Other
Work that does not fit the categories above.

03 / After you submit

Look out for an email from SII.

Free Key Results are sent to the email address you enter and confirm. They are not displayed immediately after uploading. The submission does not produce an instant construction cost estimate.

If you do not see the email in your inbox, check your spam and promotions folders too.

A few questions before you submit

See the complete report format
Can I submit before all my documents are ready?

Yes. Submit the quote you currently have. Include additional pages and relevant attachments where available; SII can only review the material it receives.

Do I need to pay before receiving any results?

No purchase is required to receive Free Key Results. These summarize the main document issues. The separate paid Complete Risk Report format contains the detailed findings; it is not included in the free results.

Can you tell me if a price is too high or a contractor is reliable?

SII reviews document clarity and consistency. We can identify pricing details, repeated items or payment terms to clarify. This is not a market-price appraisal or an assessment of contractor reliability. LEVEL 1–5 describes Document Maturity only.

Standard Integrity Institute (SII) reviews documents using SII-R001–SII-R030.

Read the review criteria

SII provides document review and risk indicators, not legal advice, engineering or market-price appraisal, a workmanship guarantee or contractor endorsement.

Service scope

Have your files ready? Start here.

Check your email address and select English. Submit one contractor’s estimate with its related attachments. Keep estimates from different contractors in separate submissions.

Submit my estimate for free

Opens the English SII upload form

© 2026 Standard Integrity Institute (SII). All rights reserved.

This report and the website content are intended solely as strategic reference for pricing and contract negotiations, and do not constitute formal legal endorsement.

© 2026 Standard Integrity Institute (SII). All rights reserved.

This report and the website content are intended solely as strategic reference for pricing and contract negotiations, and do not constitute formal legal endorsement.