AUDIT CRITERIA / PUBLIC STANDARD

SII-R001 — SII-R030

Every risk codeshould be traceable.

SII publishes 30 quotation-document review criteria so every SII-R code in a report can be traced back to the same review point, example, and clarification direction.

Search a full code, R017, work item, or keyword

04REVIEW DIMENSIONS
30PUBLIC CRITERIA
01TRACEABLE CODES

WHY A PUBLIC STANDARD

Not just “there is a risk.”See where the issue comes from.

The purpose of a public standard is not to label a quotation as good or bad. It gives recurring document issues a consistent language so you can understand what is being checked, what is missing, and what should be clarified next.

01
TRACEABLE

Every code can be traced

When a Complete Risk Report shows an SII-R code, you can return here and inspect its basis.

02
CONSISTENT

The same issue uses the same standard

Review focuses on document information and structure rather than sentiment or impressions about a contractor.

03
ACTIONABLE

Issues become clarification points

Each criterion preserves what is checked, a common example, and a direction for supplementing the document.

FOUR REVIEW DIMENSIONS

The 30 criteria are not random checks.They map to four core dimensions.

SII does not look at the total price alone. Transparency, Consistency, Reasonableness, and Executability are used to assess whether the document can be understood, compared, clarified, and used as a basis for execution.

01
TRANSPARENCY

Transparency

9 criteria

Checks whether prices, materials, brands, specifications, and scope are clearly disclosed instead of being hidden behind vague labels or lump sums.

02
CONSISTENCY

Consistency

5 criteria

Checks whether units, quantities, amounts, dates, and scope remain internally consistent across the same document set.

03
REASONABLENESS

Reasonableness

7 criteria

Checks whether payment, fees, and pricing structures have enough documented basis to be explained and cross-checked against the quotation itself.

04
EXECUTABILITY

Executability

9 criteria

Checks whether schedule, acceptance, warranty, change, and responsibility terms are defined well enough to support execution and later communication.

HOW TO USE THE STANDARD

From the report codeback to your source document.

01
REPORT

Find the SII-R code in your report

If the report shows SII-R017, use that code as the starting point for lookup.

02
STANDARD

Read the review point and example

Understand which part of the document the criterion is actually testing, not only the risk label.

03
DOCUMENT

Return to the quotation and clarify

Add the missing specification, term, payment condition, or responsibility to the document and confirm the updated version.

PUBLIC STANDARD LIBRARY

Search all 30SII-R public criteria.

Presented in the original SII-R001 to SII-R030 sequence. Search and filters only change what is displayed; criterion codes remain unchanged.

Showing 30 / 30 criteria

SERVICE BOUNDARY

The criteria assess documents,not people.

SII-R is SII's own quotation-document review framework. It is not law, engineering appraisal, price appraisal, construction-quality assurance, or a contractor determination. Triggering one criterion does not by itself mean a contractor is unlawful, malicious, or necessarily overpriced.

01DOCUMENT

Document information

Criteria focus on whether work items, quantities, specifications, pricing structure, and terms can be understood and verified.

02NOT A VERDICT

Not a verdict

SII does not replace courts, authorities, architects, engineers, valuers, or lawyers in making professional determinations.

03VERSION BASED

Based on the current version

Once a document is supplemented or revised, earlier gaps may change and the latest version should be reviewed again.

FULL DISCLAIMERRead the full service boundary and disclaimer

AUDIT CRITERIA FAQ

Before using the criteria,avoid four common misunderstandings.

START WITH YOUR DOCUMENT

Not sure which criteriayour quotation may trigger?

Upload the renovation or construction quotation you have now for free. Start with document maturity and key risk results, then use the SII-R codes to trace each issue back to the public standard.

FREE KEY RESULTSUPLOAD YOUR QUOTE
PDFs, photos, or screenshotsNo need to know the codes firstResults in 3–5 business days

© 2026 Standard Integrity Institute (SII). All rights reserved.

This report and the website content are intended solely as strategic reference for pricing and contract negotiations, and do not constitute formal legal endorsement.

© 2026 Standard Integrity Institute (SII). All rights reserved.

This report and the website content are intended solely as strategic reference for pricing and contract negotiations, and do not constitute formal legal endorsement.