Bathroom remodel estimate checklist
Bathroom remodel estimate checklist: What does the price cover?
A bathroom remodel estimate should make the scope clear before you compare totals. Check demolition, plumbing, electrical work, waterproofing, tile and fixtures separately. For each item, identify what is included, what costs extra and who supplies or installs it.
Check eight work packagesCopy the twelve questionsThis guide helps you read a quote. It does not assess waterproofing performance or workmanship.
By Standard Integrity Institute · Reviewed October 26, 2026. Remodeling terms: NARI glossary.
INTEGRITY INSTITUTE
One bathroom. An itemized scope.
Included, extra or not stated?
- Included
- Location, quantity and agreed finish
- Extra
- Item, unit and pricing method
- Not stated
- Ask first. Do not assume inclusion.
- Scope
- Cost
- Responsibility
Work packages
Eight scope checks for a bathroom remodel estimate.
Open a work package that is unclear in your estimate. Ask the contractor to record the answer in a dated revision or attachment. Keep scope questions separate from decisions about code compliance or installation methods.
Not stated does not mean excluded, or prove that a contractor has done anything wrong.
Protection and accessRooms, shared areas and site access
List areas to protect, dust controls, building permissions, water-shutoff notices and material delivery and handling. Include building rules, working hours and access restrictions in the schedule. Ask who handles any required permits and inspections, and whether their fees are included.
Removal and disposalWhat comes out, and how far removal goes
Separate tiles, ceilings, fixtures, old waterproofing and piping. State removal boundaries, disposal quantities or trips, material delivery and handling, and how work beyond that scope will be priced.
Plumbing and electricalWhat stays, what is replaced or moved
Match hot and cold water, drainage, wiring, outlets and equipment circuits to locations, quantities, material specifications and pricing units. Identify who cuts and repairs channels in walls or floors.
Base preparationRepairs, drainage positions and floor levels
Ask for the extent and quantities of leveling, base preparation and repairs. Record how drainage direction, outlet positions and threshold levels will be agreed. Appropriate professionals should determine the method for the site.
WaterproofingAreas, heights, materials and proposed method
Identify floors, walls, thresholds, corners and pipe penetrations. Specify areas, heights, material brands and models, layers and local reinforcement. Include drying time, protection during later work and project closeout responsibilities—not just “waterproofing included”.
Testing and recordsThe method, the record and any correction
An on-site professional should decide whether a water test is needed and which method is suitable. If planned, record duration, water level, checks below or next door, results, correction and rechecking responsibilities. Allow for waiting time in the schedule.
Tiles and fixturesMaterials, fittings, installation and finishing
Identify brands, models, quantities and suppliers for tiles, grout, ceilings, toilets, sinks, faucets, cabinets and hardware. Check tile layout, drilling, fittings, sealant, finishing and final cleaning separately. If a fixture or tile allowance is listed, identify what it covers and how selection differences will be priced.
Acceptance and warrantyCompletion checks, corrections and project closeout
Agree how drainage, leak-related items, tiling, finishes and fixture operation will be checked. Link outstanding work and project closeout records to the agreed final-payment conditions. Separate waterproofing, workmanship and product warranties by scope, duration, start date, exclusions and contact.
Buying your own fixtures? Check the installation too.
An owner-supplied toilet, sink or faucet still needs a clear installation scope. Identify the model, then confirm these four responsibilities.
Before ordering
Who checks dimensions, connections and site compatibility? Who handles an unsuitable item, returns and the cost?
On delivery
Who receives, carries and stores it? Who follows up on missing parts, damage or the wrong model?
At installation
Which fittings, drilling, pipe connections and finishing does the installation price cover? Who supplies extra parts?
At completion
Who checks operation? Who handles product and installation warranties, and where does each responsibility end?
More questions about the quote?
What is missing from “bathroom waterproofing included”?
Ask for locations, areas, wall heights, material brands and models, proposed layers, and details for corners and pipe penetrations. Add testing, protection during later work and warranty arrangements. These are details for the installer to specify, not a site specification chosen by this guide.
How long must a water test last to pass?
This guide does not set a universal duration or pass standard. An on-site professional should confirm whether a test is needed, the method and how to interpret it. The quote or attachment should record the agreed method, duration, responsible person, results and any correction arrangements.
Can I compare two “full renovation” totals directly?
Check the scope first. Pipe replacement, installation of owner-supplied fixtures, disposal and finishing may be covered differently. List those differences before comparing totals, and ask about anything not stated.
Can SII confirm workmanship or waterproofing performance?
No. Standard Integrity Institute (SII) reviews the quotation and related documents you provide. It does not rate contractors or carry out site surveys, construction supervision, material testing or quality certification. Clear documentation does not guarantee the construction outcome.