INTEGRITY
INSTITUTE
Carpentry and cabinet quote checklist
“Cabinetry included.”Which cabinets, exactly?
Ask for dimensions, materials, hardware and installation scope for each cabinet before comparing totals. Confirm that what is shown in the drawings—and what you discussed—is included in the price.
Check my carpentry quoteSee what a specification should includeThis guide checks documents. Appropriate professionals should confirm material suitability and on-site methods.
INTEGRITY INSTITUTE
Illustration · not an actual quotation
One cabinet. One clear specification.
Living-room TV cabinet
- Identify
- Location, cabinet ID, drawing and revision
- Measure
- Width × height × depth, internal layout
- Specify
- Panels, hardware and finishes by part
- Price
- Quantity, unit, calculation and exclusions
- Find the cabinet
- Match the details
- Check the price
What is missing from your quote?
Select anything that is unclear. We will turn your selection into a message below. This is a follow-up list, not a score or a finding about the work.
Make the quote, drawings and samples agree.
If the quote says “TV cabinet”, the drawing shows three drawers and the material schedule omits the back panel, there are still details to clarify.
Quotation
Quantity, pricing unit, cost and exclusions for each cabinet.
Drawings
The matching cabinet ID, location, dimensions, doors, drawers and revision.
Materials and samples
Which panels, hardware, colours and approved samples apply to each part.
A few common questions
Is a lump-sum carpentry price always a problem?
No. What matters is which cabinets, dimensions, materials, hardware and installation work the sum includes. A lump sum can present the total if matching details and drawings are attached. If those details are missing, ask for them.
Final measurements come later. How do I check the price now?
Record provisional dimensions, the drawing revision and pricing method. Agree who will remeasure, when dimensions will be confirmed, and how increases or reductions change the price. “Subject to site measurements” alone does not explain the adjustment.
Is a board or hardware brand enough?
You also need the product specification. Match boards to the part, material type, thickness and finish; list hardware models, quantities and agreed functions. If substitutes may be used, agree how they will be confirmed before replacement.
Can SII assess workmanship or tell me if the price is fair?
SII reviews the quotation and related documents you provide for missing, unclear or inconsistent information. It does not rate contractors or replace site measurements, material-suitability decisions, workmanship assessment, market valuation or legal advice.
