Which product?
Name the brand and series, model or another identifier for the actual product.
SII / MATERIAL CONFIRMATION SHEET
One brand can have many models, thicknesses and fittings. Identify the actual product, quantity, location and installation scope. If it changes, record the replacement, price difference and approval before treating it as agreed.
An unclear specification needs clarification. It is not evidence of poor workmanship; a detailed specification is not a quality guarantee.
SII / MATERIAL SCHEDULE NOTE
COMPARE THESE DETAILS BEFORE A SUBSTITUTION.
The quote need not become a technical manual. It should identify what you are buying, where it will be used and how the agreed details can be checked.
Name the brand and series, model or another identifier for the actual product.
Include relevant dimensions, thickness, grade, colour, finish or performance requirements.
Link quantity, unit and location to the work item. Mark estimated quantities separately.
State relevant fixing, preparation, edging, wiring, waterproofing, protection or testing.
Reference the schedule, drawing, product sheet or sample number, with date and version.
Record substitution conditions, approval, price, timing, warranty and document updates.
Start with the quoted line, then ask for the missing detail. These simplified examples explain what to clarify; they do not prescribe materials, technical specifications or a mandatory quote format.
THE QUOTED LINE
Living-room cabinetry: lump sum
WHAT THIS LINE DOES NOT TELL YOU
Two cabinets can have the same dimensions but different boards, internal layouts and hardware. “Cabinetry” alone does not tell you what is included.
ASK FOR THESE FOUR DETAILS
Substitution is not automatically a problem. An undefined original product, unpriced change or unclear approval process is what needs attention. Ask for these four steps before the change.
List both brands, models, dimensions, grades, quantities and key performance details. “An upgrade” is not a comparison.
Which functions, appearance, dimensions, durability or warranty conditions must be maintained? Ask for product sheets, samples or appropriate professional input.
Identify who proposes and confirms the change and what information they need. Keep the dated approval and revised document; follow the agreed process.
Does the substitution affect price, delivery, programme, installation, warranty or payment? Separate agreed changes, unchanged terms and unresolved points.
A matching name or price does not establish equivalence. Suitability and performance still need project-specific confirmation by an appropriate professional.
SII / REQUEST FOR CLARIFICATION
This inquiry follows your material choice: four category questions plus six general checks. Add the work item and quote version before sending. Remove inapplicable questions after pasting.
STANDARD INTEGRITY INSTITUTE
DOCUMENT REVIEW
We review the quote and attachments you submit for missing specifications, conflicting details and unclear substitution or delivery terms. LEVEL 1–5 describes Document Maturity only, not product quality or contractor capability.
Are the actual product and specifications identified?
Do the quote, drawings and sample agree?
Are price differences and substitution terms explained?
Who confirms, tests and resolves differences?
Not sure which information is missing? Submit the quote with the material schedules, drawings and attachments you already have to receive Free Key Results.
Upload your quote for Free Key ResultsOne brand may have several series, models, sizes, thicknesses, colours and fittings. Identify the actual product, then link it to the quantity, location and installation scope. A well-known brand does not make the document complete.
Selection status alone cannot answer that. For unselected items, record a provisional specification or allowance, selection deadline, approver, substitution process, price treatment and programme effects. Seek appropriate professional advice on the actual agreement and any legal questions.
No. Identify the original specification, the conditions the replacement must maintain, the comparison documents and who gives written approval. Record price, timing and warranty effects. An identical price alone does not establish equivalence.
No. Schedules, drawings, product sheets, sample approvals and contract attachments can provide the detail. Identify dates, versions and work-item references. If documents conflict, ask which version applies and have them updated rather than guessing.
No. SII reviews document information and structure. It does not provide brand recommendations, material or engineering certification, design advice, market-price appraisal, site supervision, contractor ratings, quality guarantees or legal determinations.
General guidance for reading documents and asking questions—not construction instructions or material-selection advice. Refer technical, site and legal issues to appropriate professionals for the specific project.