Contractor estimate checklist · Before signing or paying

By Standard Integrity Institute · Editorial review: October 26, 2026

Contractor estimate checklist Find what needs clarifying.

Review the scope, materials, charges, payment milestones and completion terms in the estimate you received. Mark unclear details as “To ask” to build a message for your contractor.

STANDARD INTEGRITY
INSTITUTE

PERSONAL CHECKING RECORD

What should you leave with?

  1. The estimate date and version you checked
  2. Details confirmed in writing
  3. Questions that still need an answer

Gather one contractor’s estimate, drawings, material list and payment schedule. A bid or proposal may use different headings; check its actual content and record missing attachments.

SII-R001–SII-R030

Check the wording, not your memory.

Choose a dimension or search a keyword. Open any item for a checking tip and a question to ask.

30 / 30

Transparency

What does the price include?

SII-R001Not checked

How is each item priced?

Checking tip and question

What to look forLook for a description, quantity, unit, unit price and subtotal. A total alone does not show what you are paying for.

A question to sendPlease add the quantity, unit, unit price and subtotal for each main work item.
Read the formal criterion
SII-R002Not checked

What does the lump sum include?

Checking tip and question

What to look forA package price can work. It still needs a list of work, materials, quantities and exclusions.

A question to sendPlease list the work, materials and quantities included in this lump sum, plus anything charged separately.
Read the formal criterion
SII-R004Not checked

Can you identify the exact product?

Checking tip and question

What to look forFixtures, kitchen equipment, air conditioning and hardware need a brand, model or product reference—not just a generic name.

A question to sendPlease provide the brand, model or product reference for the main equipment and explain how substitutions will be agreed.
Read the formal criterion
SII-R008Not checked

Are material specifications complete?

Checking tip and question

What to look forCheck dimensions, thickness, grade, series and installation method. “Timber board” is not a complete specification.

A question to sendPlease add the dimensions, thickness, grade, series and installation method for the main materials.
Read the formal criterion
SII-R011Not checked

What does “premium” mean here?

Checking tip and question

What to look forWords such as “premium” and “high quality” need a product reference, grade or specific standard you can check.

A question to sendPlease replace vague quality descriptions with a brand, model, grade or specific checkable specification.
Read the formal criterion
SII-R015Not checked

Which paint, and which coats?

Checking tip and question

What to look forLook for brand, range, color and the primer/top-coat system. “Emulsion paint” leaves these choices open.

A question to sendPlease specify the paint brand, range, color and intended primer and top-coat layers.
Read the formal criterion
SII-R018Not checked

Which cables and pipes will be used?

Checking tip and question

What to look forCheck cable size, pipe diameter, material, model and relevant system or pressure ratings. Do not guess technical suitability.

A question to sendPlease list cable sizes, pipe diameters, materials, models and the system specifications required for this project.
Read the formal criterion
SII-R021Not checked

Is the glass type specified?

Checking tip and question

What to look forFor glass doors, windows or partitions, check thickness, type, tempering and applicable safety specifications.

A question to sendPlease specify the glass thickness, type, whether it is tempered and the applicable safety specifications.
Read the formal criterion
SII-R023Not checked

Are design and construction fees separate?

Checking tip and question

What to look forYou should be able to distinguish design, drawings and site revisions from construction charges.

A question to sendPlease list design, drawing, site-revision and construction services separately, with the fee for each.
Read the formal criterion

Consistency

Do the numbers and documents agree?

SII-R003Not checked

Do the figures add up?

Checking tip and question

What to look forMultiply quantity by unit price, then add the subtotals. Discounts, tax and other adjustments should reconcile to the total.

A question to sendPlease check quantity × unit price, all subtotals and the final amount after discounts, tax or other adjustments.
Read the formal criterion
SII-R012Not checked

Are the units comparable?

Checking tip and question

What to look forSquare feet, linear feet, sets and lump sums are different measures. Mixed units need a conversion or explanation.

A question to sendPlease use consistent units for similar work, or provide the conversion and quantity basis.
Read the formal criterion
SII-R019Not checked

Do all documents use the same dates?

Checking tip and question

What to look forCompare start dates, completion dates and durations in the quote, attachments and payment schedule.

A question to sendPlease confirm that the quote, attachments and payment schedule use the same dates and schedule version.
Read the formal criterion
SII-R025Not checked

Are labels and versions correct?

Checking tip and question

What to look forCheck the project name, headings, work descriptions and version number so nobody works from the wrong document.

A question to sendPlease proofread the project name, headings, work descriptions and version number, and identify the current quote.
Read the formal criterion
SII-R029Not checked

Does the quote match the drawings?

Checking tip and question

What to look forUse one drawing version to spot work shown but not priced, priced but not shown, or described differently.

A question to sendPlease check the quote against the same drawing version and explain any unpriced, unshown or differently specified work.
Read the formal criterion

Reasonableness

What supports the charges and payments?

SII-R005Not checked

What does the deposit pay for?

Checking tip and question

What to look forCheck the work, materials or written deliverables behind the deposit—not just the percentage requested.

A question to sendPlease explain what work, materials or deliverables the deposit covers and identify verifiable payment milestones.
Read the formal criterion
SII-R009Not checked

Can the unit price be explained?

Checking tip and question

What to look forAsk what materials, quantities, methods and scope support the price. A single figure is not a market-price appraisal.

A question to sendPlease explain the materials, quantity, method, scope and cost components behind this unit price.
Read the formal criterion
SII-R013Not checked

Who removes the demolition waste?

Checking tip and question

What to look forCheck bagging, handling, vehicle trips, transport and disposal. Are they included or charged separately?

A question to sendPlease confirm which demolition waste-handling, transport and disposal costs are included and how extras are charged.
Read the formal criterion
SII-R016Not checked

What do management and other fees cover?

Checking tip and question

What to look forA short fee label is fine; an unexplained charge is not useful. Look for services, duration and cost components.

A question to sendPlease list the services, duration and cost components covered by management, supervision and miscellaneous fees.
Read the formal criterion
SII-R020Not checked

When is the final payment due?

Checking tip and question

What to look forCheck its timing against completion, acceptance and defect correction. “Final payment” alone does not define the trigger.

A question to sendPlease state how final payment relates to completion, acceptance and defect correction, including written confirmation.
Read the formal criterion
SII-R024Not checked

Is the demolition scope clear?

Checking tip and question

What to look forLook for locations, quantities, access conditions and disposal arrangements so the charge can be checked against the work.

A question to sendPlease break down demolition locations, quantities, handling conditions, disposal arrangements and related charges.
Read the formal criterion
SII-R028Not checked

Can material prepayments be verified?

Checking tip and question

What to look forIf advance payment is requested, check product specifications, ordering or delivery records and what triggers payment.

A question to sendPlease identify the specifications, order or delivery records and verification milestones supporting material prepayment.
Read the formal criterion

Executability

How will timing, delivery and responsibilities be confirmed?

SII-R006Not checked

When will work start and finish?

Checking tip and question

What to look forLook for dates, a defined duration or a delivery schedule. “Subject to site progress” gives no usable time baseline.

A question to sendPlease add the start date, expected finish date or defined duration, and how schedule changes will be confirmed.
Read the formal criterion
SII-R007Not checked

What does the warranty cover?

Checking tip and question

What to look forLook for the start point, duration, coverage, exclusions and repair-request process—not simply the word “warranty”.

A question to sendPlease state the warranty start point, duration, coverage, exclusions and repair-request process.
Read the formal criterion
SII-R010Not checked

How will disagreements be recorded?

Checking tip and question

What to look forCheck who to contact, how to give notice and how both sides will record, confirm and handle a disagreement.

A question to sendPlease define how disputes or site discrepancies will be notified, recorded, confirmed in writing and handled.
Read the formal criterion
SII-R014Not checked

How are changes agreed before work?

Checking tip and question

What to look forCheck how additions, omissions and changed methods are priced, timed and approved before they are carried out.

A question to sendPlease define pricing, time adjustments and written approval before additions, omissions or changed methods are carried out.
Read the formal criterion
SII-R017Not checked

What counts as acceptance?

Checking tip and question

What to look forLook for inspection items, the checking method, who confirms them, correction deadlines and rechecks.

A question to sendPlease list stage and final acceptance checks, who confirms them, defect-correction deadlines and recheck arrangements.
Read the formal criterion
SII-R022Not checked

What happens if work is delayed?

Checking tip and question

What to look forBeyond the target finish date, check notice, cause, responsibility and recovery arrangements.

A question to sendPlease agree how delays will be notified, causes and responsibilities confirmed, and recovery and schedule changes handled.
Read the formal criterion
SII-R026Not checked

Who protects and cleans the site?

Checking tip and question

What to look forCheck protection for floors, furniture, lifts and corridors, plus cleaning, reinstatement and damage responsibilities.

A question to sendPlease define site and common-area protection, cleaning, reinstatement and responsibility for damage.
Read the formal criterion
SII-R027Not checked

How will waterproofing be tested?

Checking tip and question

What to look forLook for materials, layers, locations, coverage and testing or acceptance arrangements. Wording alone does not prove workmanship.

A question to sendPlease specify waterproofing materials, layers, locations, coverage and flood-testing or other acceptance arrangements.
Read the formal criterion
SII-R030Not checked

Who issued and confirmed this version?

Checking tip and question

What to look forLook for company and contact details, date, version and an identifiable signature, stamp or other confirmation.

A question to sendPlease add company and contact details, date, version and an identifiable signature, stamp or other confirmation.
Read the formal criterion

YOUR FOLLOW-UP NOTE

Take your questions with you.

Only items marked “To ask” appear here. After copying, add the quote date, version and relevant work item before sending.

0 to ask

An empty question list does not prove the document is complete or the project is risk-free. Review unchecked items too; “Not applicable” does not mean passed.

No questions selected yet. Mark anything missing or unclear as “To ask” to add it here.

CLOSE THE LOOP

When the reply arrives, update the document.

Ask for the answers to be added to the quote or attachments, with a revision date. Change an item to “Confirmed” once you have checked the update—not just because someone says it is included.

Compare contractor estimates on matching scope

Before you use the checklist

Must a quote meet all 30 checks?

No. This is a tool for organizing document questions, not a pass/fail test. Mark work outside your project as “Not applicable”. Ask about missing details that affect charges, payments or delivery before deciding.

Can I start without a contract?

Yes. Start with the quote you have. Compare it with any drawings, material lists and payment schedules. Mark missing information as “To ask” rather than guessing to finish the checklist.

Does confirming every item mean it is safe to sign?

No. Your selections record your own reading. They are not an SII review or a LEVEL 1–5 Document Maturity assessment, and do not guarantee price, workmanship or legal effect.

STANDARD INTEGRITY INSTITUTE

Stuck on a detail? Let SII review the documents.

Submit one contractor’s estimate with its drawings and supporting notes for Free Key Results. SII reviews the documents and flags details to clarify. It does not rank contractors, appraise local market prices or decide whether you should sign.

SII reviews documents, not contractors. It does not provide legal advice, engineering appraisal, market-price appraisal or construction-quality guarantees.

Contractor estimate checking record

Personal checking record, not an SII review. Add the quote date/version and your checking date.

Reviewed: 0 / 30 · 0 to ask

Transparency

SII-R001 · How is each item priced?

Not checked

Look for a description, quantity, unit, unit price and subtotal. A total alone does not show what you are paying for.

A question to send: Please add the quantity, unit, unit price and subtotal for each main work item.

SII-R002 · What does the lump sum include?

Not checked

A package price can work. It still needs a list of work, materials, quantities and exclusions.

A question to send: Please list the work, materials and quantities included in this lump sum, plus anything charged separately.

SII-R004 · Can you identify the exact product?

Not checked

Fixtures, kitchen equipment, air conditioning and hardware need a brand, model or product reference—not just a generic name.

A question to send: Please provide the brand, model or product reference for the main equipment and explain how substitutions will be agreed.

SII-R008 · Are material specifications complete?

Not checked

Check dimensions, thickness, grade, series and installation method. “Timber board” is not a complete specification.

A question to send: Please add the dimensions, thickness, grade, series and installation method for the main materials.

SII-R011 · What does “premium” mean here?

Not checked

Words such as “premium” and “high quality” need a product reference, grade or specific standard you can check.

A question to send: Please replace vague quality descriptions with a brand, model, grade or specific checkable specification.

SII-R015 · Which paint, and which coats?

Not checked

Look for brand, range, color and the primer/top-coat system. “Emulsion paint” leaves these choices open.

A question to send: Please specify the paint brand, range, color and intended primer and top-coat layers.

SII-R018 · Which cables and pipes will be used?

Not checked

Check cable size, pipe diameter, material, model and relevant system or pressure ratings. Do not guess technical suitability.

A question to send: Please list cable sizes, pipe diameters, materials, models and the system specifications required for this project.

SII-R021 · Is the glass type specified?

Not checked

For glass doors, windows or partitions, check thickness, type, tempering and applicable safety specifications.

A question to send: Please specify the glass thickness, type, whether it is tempered and the applicable safety specifications.

SII-R023 · Are design and construction fees separate?

Not checked

You should be able to distinguish design, drawings and site revisions from construction charges.

A question to send: Please list design, drawing, site-revision and construction services separately, with the fee for each.

Consistency

SII-R003 · Do the figures add up?

Not checked

Multiply quantity by unit price, then add the subtotals. Discounts, tax and other adjustments should reconcile to the total.

A question to send: Please check quantity × unit price, all subtotals and the final amount after discounts, tax or other adjustments.

SII-R012 · Are the units comparable?

Not checked

Square feet, linear feet, sets and lump sums are different measures. Mixed units need a conversion or explanation.

A question to send: Please use consistent units for similar work, or provide the conversion and quantity basis.

SII-R019 · Do all documents use the same dates?

Not checked

Compare start dates, completion dates and durations in the quote, attachments and payment schedule.

A question to send: Please confirm that the quote, attachments and payment schedule use the same dates and schedule version.

SII-R025 · Are labels and versions correct?

Not checked

Check the project name, headings, work descriptions and version number so nobody works from the wrong document.

A question to send: Please proofread the project name, headings, work descriptions and version number, and identify the current quote.

SII-R029 · Does the quote match the drawings?

Not checked

Use one drawing version to spot work shown but not priced, priced but not shown, or described differently.

A question to send: Please check the quote against the same drawing version and explain any unpriced, unshown or differently specified work.

Reasonableness

SII-R005 · What does the deposit pay for?

Not checked

Check the work, materials or written deliverables behind the deposit—not just the percentage requested.

A question to send: Please explain what work, materials or deliverables the deposit covers and identify verifiable payment milestones.

SII-R009 · Can the unit price be explained?

Not checked

Ask what materials, quantities, methods and scope support the price. A single figure is not a market-price appraisal.

A question to send: Please explain the materials, quantity, method, scope and cost components behind this unit price.

SII-R013 · Who removes the demolition waste?

Not checked

Check bagging, handling, vehicle trips, transport and disposal. Are they included or charged separately?

A question to send: Please confirm which demolition waste-handling, transport and disposal costs are included and how extras are charged.

SII-R016 · What do management and other fees cover?

Not checked

A short fee label is fine; an unexplained charge is not useful. Look for services, duration and cost components.

A question to send: Please list the services, duration and cost components covered by management, supervision and miscellaneous fees.

SII-R020 · When is the final payment due?

Not checked

Check its timing against completion, acceptance and defect correction. “Final payment” alone does not define the trigger.

A question to send: Please state how final payment relates to completion, acceptance and defect correction, including written confirmation.

SII-R024 · Is the demolition scope clear?

Not checked

Look for locations, quantities, access conditions and disposal arrangements so the charge can be checked against the work.

A question to send: Please break down demolition locations, quantities, handling conditions, disposal arrangements and related charges.

SII-R028 · Can material prepayments be verified?

Not checked

If advance payment is requested, check product specifications, ordering or delivery records and what triggers payment.

A question to send: Please identify the specifications, order or delivery records and verification milestones supporting material prepayment.

Executability

SII-R006 · When will work start and finish?

Not checked

Look for dates, a defined duration or a delivery schedule. “Subject to site progress” gives no usable time baseline.

A question to send: Please add the start date, expected finish date or defined duration, and how schedule changes will be confirmed.

SII-R007 · What does the warranty cover?

Not checked

Look for the start point, duration, coverage, exclusions and repair-request process—not simply the word “warranty”.

A question to send: Please state the warranty start point, duration, coverage, exclusions and repair-request process.

SII-R010 · How will disagreements be recorded?

Not checked

Check who to contact, how to give notice and how both sides will record, confirm and handle a disagreement.

A question to send: Please define how disputes or site discrepancies will be notified, recorded, confirmed in writing and handled.

SII-R014 · How are changes agreed before work?

Not checked

Check how additions, omissions and changed methods are priced, timed and approved before they are carried out.

A question to send: Please define pricing, time adjustments and written approval before additions, omissions or changed methods are carried out.

SII-R017 · What counts as acceptance?

Not checked

Look for inspection items, the checking method, who confirms them, correction deadlines and rechecks.

A question to send: Please list stage and final acceptance checks, who confirms them, defect-correction deadlines and recheck arrangements.

SII-R022 · What happens if work is delayed?

Not checked

Beyond the target finish date, check notice, cause, responsibility and recovery arrangements.

A question to send: Please agree how delays will be notified, causes and responsibilities confirmed, and recovery and schedule changes handled.

SII-R026 · Who protects and cleans the site?

Not checked

Check protection for floors, furniture, lifts and corridors, plus cleaning, reinstatement and damage responsibilities.

A question to send: Please define site and common-area protection, cleaning, reinstatement and responsibility for damage.

SII-R027 · How will waterproofing be tested?

Not checked

Look for materials, layers, locations, coverage and testing or acceptance arrangements. Wording alone does not prove workmanship.

A question to send: Please specify waterproofing materials, layers, locations, coverage and flood-testing or other acceptance arrangements.

SII-R030 · Who issued and confirmed this version?

Not checked

Look for company and contact details, date, version and an identifiable signature, stamp or other confirmation.

A question to send: Please add company and contact details, date, version and an identifiable signature, stamp or other confirmation.

SII reviews documents, not contractors. It does not provide legal advice, engineering appraisal, market-price appraisal or construction-quality guarantees.

© 2026 Standard Integrity Institute (SII). All rights reserved.

This report and the website content are intended solely as strategic reference for pricing and contract negotiations, and do not constitute formal legal endorsement.

© 2026 Standard Integrity Institute (SII). All rights reserved.

This report and the website content are intended solely as strategic reference for pricing and contract negotiations, and do not constitute formal legal endorsement.