The inspection found a problem.What does the repair quote cover?
Pick one finding. Which line in the quotation addresses it? Can you see the scope, cost and checks to be made when the work is finished?
“Repairs as per inspection report” still leaves room for different interpretations. Start with the example, then collect the questions your contractor needs to answer.
Illustrative example—not a real case or repair advice
STANDARD INTEGRITY INSTITUTE
Inspection report
I-03 | Suspected seepage near bathroom threshold
Quotation received
Q-02 | Bathroom waterproofing, lump sum
Still to clarify
Does Q-02 address I-03? What removal, repair and reinstatement work is included?
Document-matching exercise
These references link the example documents; they are not SII risk codes.
01 / MATCH
Give every finding a next step—not necessarily the same contractor.
Add a “How it will be handled” column to your inspection list. An explicit plan for each finding is easier to check than “all defects included”.
01
In this quotation
Note the quoted item number and check that the location and scope match.
02
Handled separately
Name the other quotation or contact, so neither party assumes the other will do it.
03
Not yet decided
Record the open question, contact and reply date. Do not treat it as included.
For suspected leaks, electrical safety concerns or other issues requiring an on-site assessment, ask an appropriate professional about the cause and repair. This guide helps you check the written scope only.
02 / CHECK
Ten things to check in the quotation.
Select a question if the detail is missing and relevant to your repairs. This collects follow-ups; it does not score the quote or assess the safety of the work.
Match the finding and scope
01
Which finding does this item address?
Add the inspection reference, location and photo page beside the quoted work. Keep a separate record of findings outside this repair package.
Ask the contractor
Please match each quoted item to an inspection finding. For findings outside this quotation, please record how they will be handled separately.
02
Where does the repair start and stop?
“Local repairs” does not define a boundary. Mark the room, wall or area in writing or on a drawing, with included and excluded work identified.
Ask the contractor
Please mark the repair location and boundaries, and list the work excluded from this scope.
Check the work and cost
03
How are quantities and costs calculated?
Check quantities, units, rates and subtotals. For lump-sum items, list what is included. Ask how both increases and reductions will be priced.
Ask the contractor
Please provide quantities, units, rates and the measurement method. What does each lump sum include, and how will quantity changes affect the price?
04
Which materials will actually be used?
“Waterproofing” or “paint” alone leaves the product open. Specify the relevant brand, model and specification, plus a process for agreeing substitutions.
Ask the contractor
Please identify the material brands, models and specifications. How will substitutions be agreed before use?
05
What will be done—and checked?
Ask the contractor to describe the proposed steps, site assumptions and completion checks. Appropriate professionals should confirm methods and test conditions that depend on the property.
Ask the contractor
Please describe the repair steps, completion criteria and checks. Which conditions still require an on-site assessment?
06
Who puts everything back?
List removal, protection of belongings and shared areas, waste disposal, fixture refitting and reinstatement. Identify any work handed over to someone else.
Ask the contractor
Who is responsible for removal, protection, waste disposal, refitting and reinstatement? Which of these costs are included?
Agree changes, payments and follow-up
07
What could require a separate quotation?
Record exclusions and site assumptions. For problems discovered after opening up, agree how findings will be documented, reported and quoted.
Ask the contractor
Please list exclusions and site assumptions. How will concealed problems be recorded, reported and quoted if discovered?
08
How are additions and omissions agreed?
“To be priced on site” leaves cost and timing unresolved. Record the change, price, schedule impact, person authorising it and payment or credit arrangements.
Ask the contractor
Before any addition or omission, please provide the scope, price and schedule impact, who confirms it in writing, and when payment or credit applies.
09
What can you check before each payment?
Read deposit, progress-payment and final-payment terms separately. Ask what the deposit covers and which completed work and records support later payments.
Ask the contractor
Please state what the deposit covers and the completed work, inspection records and conditions linked to each progress and final payment.
10
Who responds if the problem returns?
Check acceptance arrangements, correction deadlines, warranty start date, coverage, exclusions and the contact person. A duration alone does not explain the process.
Ask the contractor
Please state the acceptance process, correction deadlines and warranty start date, coverage and exclusions. If the problem returns, whom do I contact and when will they respond and arrange action?
03 / ASK
Send the questions together.
Your selections become a message below. Copy it, add your inspection references and quotation version, then review it before sending.
0 questions selected
This page does not send anything for you. The tool does not save selections; refreshing clears them.
Keep the answer with the quotation—not only in a chat.
Ask for the agreed scope, materials, costs and conditions to be included in the updated documents. Keep these three sets together and check their references and versions.
01
Inspection report
Keep finding references, photos, locations and descriptions.
02
Complete quotation and attachments
Include every work item, note, exclusion and the current date or version.
03
Drawings and written confirmations
Include scope drawings, material schedules and agreed changes.
Comparing two quotes? Align inclusions and exclusions before comparing totals.
Why check the quotation if the inspection report is detailed?
The inspection report records observed conditions. The quotation should explain which work is being offered, how it is priced and how completion will be checked. Detail in the first document does not mean every repair is included in the second.
What should I ask if it only says “as per inspection report”?
Request the report date or version and finding references, followed by itemised scope, proposed work, inclusions, exclusions, costs and completion checks. Conditions awaiting an on-site assessment should be marked separately.
What can I do with only photos or a brief estimate?
Identify each photo’s location and issue, then request the full quotation, attachments and notes. Keep missing information open for clarification. Do not assume it is included or choose a repair method from photos alone.
Can SII confirm the repair method or the lowest price?
No. SII reviews the quotation documents provided. It does not carry out home inspections or replace engineering judgement, legal advice or market valuation. Clearer documents do not guarantee workmanship or outcomes.
STANDARD INTEGRITY INSTITUTE
Want help finding what your quotation leaves unclear?
Upload a quotation for Free Key Results. SII reviews the information and conditions in documents; it does not rate contractors or decide whether you should sign.
This report and the website content are intended solely as strategic reference for pricing and contract negotiations, and do not constitute formal legal endorsement.
This report and the website content are intended solely as strategic reference for pricing and contract negotiations, and do not constitute formal legal endorsement.