HOME INSPECTION / QUOTATION REVIEW
An inspection looks at the home.A quote review looks at the written scope.
An inspection report records findings about the property. A repair quote should explain the proposed work, its price and its limits. Having the first document does not mean the second is complete.
Inspection coverage depends on the agreed service. SII reviews documents; it does not inspect properties or guarantee completed work.
DOCUMENT PAIR / ILLUSTRATION
One wall. Two different questions.
Visible water staining beside a window.
What was observed?Wall repairs — lump sum.
Which wall, how much and what is included?What does each service actually do?
One examines conditions on site. The other examines the supplied documents. Match your question to the right service.
What it examines
Home inspectionThe property, equipment and on-site conditions within the agreed inspection scope.
Quotation reviewWork items, specifications, quantities and terms in the quotation and its attachments.
What it asks
Home inspectionWhich locations have observations or test findings that need follow-up?
Quotation reviewWhat is missing, inconsistent or still undefined in the documents?
What it uses
Home inspectionSite observations, photos, measurements or tests, depending on the service.
Quotation reviewThe quote, drawings, inspection records and written clarifications you supply.
When it helps
Home inspectionWhen buying, taking handover or checking property conditions, according to your needs.
Quotation reviewAfter receiving a renovation or repair quote, especially before a deposit or signature.
What comes next
Home inspectionEstablish who should investigate further, carry out repairs or re-inspect.
Quotation reviewAsk the provider to fill the gaps, then keep the agreed details in writing.
What it cannot replace
Home inspectionAn inspection report does not establish that a repair quotation is complete.
Quotation reviewNot a site inspection, diagnosis, engineering assessment or legal opinion.
Which document do you have?
Choose the closest situation. Get the right information before deciding whether to buy another service.
Request an itemised repair quote first.
- Gather first
- Mark the report items, locations and photos you want addressed. Keep the original records.
- Who to ask
- Ask the prospective repair provider for an itemised quote. Where the cause or suitable method is unclear, arrange the relevant on-site professional advice first.
- Then
- Once a quote exists, match its repair items to the report. An observed condition alone does not establish the right repair method.
Have a quote? Check these six things.
You do not need to learn every construction method. Start by asking the provider to answer these questions in writing.
Scope: exactly where does the work stop?
Identify locations, areas, work items and exclusions. A repair quote should link back to inspection references. “Whole home” and “lump sum” still need an itemised scope.
Materials: a name, or a checkable specification?
Request brands, models, dimensions or applicable specifications, plus a process for agreeing substitutes. Suitability for the site still requires relevant professional judgment.
Quantities: how was the total calculated?
List quantities, units, rates and calculation rules. Identify items requiring measurement and how changes in measured quantities will affect the price.
Associated work: who makes good afterwards?
Check protection, demolition, disposal, patching, finishes, testing and reinstatement. Where several providers are involved, record their responsibilities and handover conditions.
Payments: what work does each instalment cover?
Link payments to work stages and confirmation records. Set out completion checks, outstanding defects and change costs, rather than recording payment dates alone.
Warranty: what happens if a problem returns?
State the start date, coverage, exclusions, reporting and response process. If responsibility for an issue such as leakage is unresolved, label it as unresolved—not as an agreed promise.
STANDARD INTEGRITY INSTITUTE
DOCUMENT REVIEW / 04 DIMENSIONS
SII reviews the document in front of you.
Four dimensions help identify missing information and useful follow-up questions. They are not a contractor rating.
Transparency
Identifiable scope and specifications
Consistency
Quote and attachments agree
Reasonableness
Checkable quantities and pricing logic
Executability
Clear responsibilities and confirmation steps
Still deciding which service you need?
Do I need quote review after a home inspection?
Not necessarily as a separate paid service, but the repair quote still needs checking. Inspection findings do not automatically become an agreed scope, specification, price or warranty. Ask the provider to clarify gaps first, then decide whether document review would help.
Can SII replace a home inspection?
No. SII does not visit the property. A quotation cannot establish property conditions, the cause of leakage, construction safety or repair effectiveness. Those questions require the relevant on-site professional service.
What if I have an inspection report but no repair quote?
Identify the findings you want addressed and request an itemised quotation. The inspection report can support a later document review, but it does not replace a written scope, material specifications, pricing or payment terms.
When should I check a renovation quote?
Start once the quote identifies the proposed work. Confirm scope and terms in writing before a deposit or signature. Update the document set when the design or repair scope changes.
Should I compare inspection and SII prices directly?
They deliver different things. Compare each service’s scope, information requirements, deliverables and limits before its price. A less expensive service is not a substitute if it answers a different question.
Does a clear quote mean a fair price or guaranteed workmanship?
No. Clear documents make comparison and follow-up easier. They are not a market valuation, legal opinion, engineering certification or quality guarantee. SII assesses documents, not providers or people, and does not decide whether you should sign.
General document-reading guidance only. Seek appropriate professional advice for site inspections, diagnosis, legal matters or engineering questions.