What belongs ineach quotation field?
Start with the work, quantity, materials and exclusions. Then check how the price and terms fit together. If the quote gives only an item name and a total, ask for the missing details—you may not need a different form.
A template helps organise information. It is not a universal contract, price guide or assurance that you can sign.
Illustrative wording · not a case study
“Cabinet works, lump sum.” What is missing?
- Work and location
- Living-room TV cabinet: manufacture, delivery and installation. Location and dimensioned drawing reference still to be confirmed.
- Quantity and price
- Record the quantity, unit, pricing basis and subtotal separately. A fixed total still needs a defined scope.
- Materials and hardware
- Identify the boards, doors, hinges and runners by relevant brand, model and dimensions or thickness. Details pending.
- Included and extra work
- Does the price cover measuring, installation and finishing? Who handles socket relocation, lighting and wall repairs?
“Pending” means unresolved. A blank or example entry is not an agreed specification.
Find the field you need help with.
Eight field groups, each with a question you can send. Details can sit in drawings, schedules or terms—provided the quote identifies the right attachment and revision.
01Project details: whose quote, which project and which revision?
Please identify the quoting business and contact, client, site address, project, quotation date, reference, revision and validity period. Which earlier documents does this version replace, and which attachment revisions does it use?
Keep this in the recordThe heading should identify the parties and project. Keep a revision record showing dates, changes and linked attachments.
When the wording is vagueAn undated price sheet is not enough to identify the current offer. Ask for the project, date and revision rather than relying on when a message arrived.
02Work item: what does this line actually buy?
Please describe the main work items and their locations. For broad entries such as “bathroom renovation” or “cabinet works”, what demolition, fabrication, installation and finishing work is included?
Keep this in the recordFor example, “living-room TV cabinet manufacture and installation”, linked to a dimensioned drawing and scope list. This illustrates wording, not a standard package.
When the wording is vague“Renovation works” names a category, not a defined scope. Ask for the actual work list.
03Quantity: how much work, and how was it measured?
Please state the quantity, measured area or extent, and the drawing or measurement record used for each main item. Is it estimated or confirmed? If the site quantity differs, does the price change, and how is that agreed?
Keep this in the recordLink quantities to locations, drawings or measurement records. Distinguish a fixed price for a defined scope from work charged by actual measured quantity.
When the wording is vague“One batch” needs a scope and pricing explanation. Do not assume every lump-sum item is remeasured.
04Unit: what does the number stand for?
Please identify the unit and measurement definition for each quantity. Does it mean square metres, linear metres, items, sets or a lump sum? Please explain any local unit, conversion, opening deduction or minimum measurement rule.
Keep this in the recordKeep the quantity and unit together. Record conversions and deduction rules where they affect the calculation.
When the wording is vagueA bare number such as “20” cannot be compared until its unit and measurement basis are known.
05Unit price and total: can you follow the calculation?
For quantity-based items, please show the quantity, unit price, subtotal and calculation. For fixed-price items, identify the amount and scope attachment. Please also explain the currency, tax, discounts, allowances and extras included in the total.
Keep this in the recordCheck each line using its actual pricing basis, then reconcile the summary. A total excluding tax or work is not directly comparable with one including it.
When the wording is vagueIf there is only one overall figure, ask what makes it up. Correct arithmetic does not establish that a price is fair.
06Materials: which product will actually be supplied?
Please identify the main materials and equipment by brand, range or model and relevant size, thickness, material, grade, colour and hardware. What remains unselected? How will substitutions and any price difference be confirmed?
Keep this in the recordAn attached schedule or catalogue can work if it identifies the selected product and revision. Mark irrelevant fields as not applicable rather than inventing details.
When the wording is vague“Premium”, “imported” or “equivalent” does not identify a product. Ask for checkable specifications and a substitution process.
07Scope and notes: what is included, excluded or charged extra?
Please define the work locations and limits, including protection, removal, handling, waste disposal, testing, repairs and reinstatement where relevant. Which items are excluded, who handles them, and how are possible extras quoted and confirmed?
Keep this in the recordSeparate included, excluded and unresolved work. Identify responsibilities and drawing references; do not bury every exception in a general note.
When the wording is vague“Others charged separately” or “subject to site conditions” needs an explanation. Record verbal extras or upgrades too.
08Terms: do the quote, payment schedule and contract agree?
Please identify the documents covering payment purposes and due conditions, start and completion arrangements, acceptance and corrections, variations, and warranty scope, duration, start date and exclusions. Where do the documents differ, and how will a revised version be confirmed?
Keep this in the recordRecord the document, section and revision for each term. Check advances, progress payments and the final balance separately; this guide does not require every payment to follow completed work.
When the wording is vague“Other matters by agreement” leaves a question unanswered. List what remains open and obtain a specific reply.
A blank format or questions to send?
Choose what you need, then paste it into your own document or message. The inquiry always includes all eight questions, regardless of which sections are open. Nothing is sent for you.
Four steps to use the format.
- Gather the current quote, drawings, material and payment schedules, and contract. Keep old revisions separate.
- Fill in work, quantities, units, pricing and specifications for each item. Mark unknown details as pending.
- Separate inclusions, exclusions, possible extras and responsibilities. Record verbal additions in writing.
- Check the summary, terms and attachments against one another. List changes and obtain confirmation from both sides.
A filled cell can still leave a question open.
Focus first on missing information that affects scope, cost or delivery. These six patterns call for clarification, not a judgment about the contractor.
Three gaps in the entries
A full-looking form with key details missing
Can each line explain the work, quantity, materials and scope? Add a field or attachment where needed; a tidy layout is not evidence of completeness.
Every line says “lump sum”
A lump sum can work when its scope and attachments are identifiable. Remeasured work also needs a measurement and price-adjustment basis.
Adjectives instead of product details
“Premium” and “imported” do not identify what will be supplied. Link specifications to a material schedule and selection record, with undecided products marked.
Three mistakes when using a template
Verbal promises stay outside the document
Record waste disposal, upgrades or warranty promises against the relevant item, including when they were confirmed. Do not rely on memory.
Copying another project without adapting it
Keep useful fields and add the records your project needs. A new home, older property, bathroom or small repair will not have identical attachments or unresolved issues.
Treating blanks as agreement
Blanks, pending entries and sample text are not confirmed terms. Raise missing details that affect cost, scope or terms and obtain a clear response.
Before you use a template.
Do I have to use SII’s format?
No. A spreadsheet, PDF or contractor’s existing format can work. These fields are an organising aid, not a mandatory format for every project or jurisdiction. The information should be findable and the revisions identifiable.
Is a completed template enough to sign?
No. What the entries say matters, as do the project’s attachments, terms and unresolved issues. Filling the fields does not decide whether you should sign. SII does not make that decision for you.
Must every lump sum be split into unit prices?
First establish the pricing basis. A fixed total can refer to a defined scope and material schedule; do not invent unit prices. Remeasured items need their quantities, units, prices and adjustment rules clarified.
Is a material brand enough?
It may not identify the product. One brand can offer many ranges and models. Ask for the relevant specifications, selection record and substitution process; do not force irrelevant details into a field.
Can specifications and terms be in attachments?
Yes. Identify each attachment and revision in the quote, and link it back to the relevant items. If the quote, drawings and contract differ, list the differences and ask both sides to confirm the revision.
Do I still need to read the contract?
Read the documents together. Prices and work may be in the quote, while payment, timing, acceptance, variations and warranty terms sit elsewhere. A document’s title does not establish that it contains every agreement.
What can SII help review?
You can submit a quotation with related material schedules, payment schedules, drawings and supporting documents. SII reviews the submitted information and identifies gaps and follow-up questions. It does not rate contractors or replace site inspections or professional assessments.
This guide helps you read and organise documents. It does not determine workmanship, market value, contract validity or liability. Take project-specific design, engineering, valuation or legal questions to an appropriate professional.
STANDARD INTEGRITY INSTITUTE
READ → COMPARE → DISCUSS
Still unsure what the quote leaves out?
SII reviews submitted documents through Transparency, Consistency, Reasonableness and Executability, helping you identify what needs clarification. LEVEL 1–5 describes Document Maturity only—not a contractor rating or permission to sign.